Finally got all the hardi board siding on the west side up. |
A busy assortment of past and present. |
![]() |
Boys' Sunday Drive. "Jelly Doughnut!" |
The Establishment getting established. |
Airy options. |
Meter/panel combo installed waiting for inspection and power company to hook up. |
Can you find Georgia Dog. |
Interior of Establishment. |
A start on first painting of Spring. |
Abstraction in drywall |
Installing curb find. |
It will light up. |
Custom built wood shaped stretcher. Primed and drying |
The canvas to be stretched. As is evident, it was a painting I had done on a traditional stretcher bars. At a point I un-stretched it and now am reappropriating it as "Thug" |
The canvas stretched on its bars. The composition has already begun to change. |
Further compositional development. |
"Thug. " A stopping point. For now. |
Where we left off. |
Sheathing. |
Sheathed back wall before house wrap. This is the wall. |
Heart it. Like a hot air balloon . |
Awesome natural light. |
Studio is not done but the artist can't wait. |
Wrap it up. |
Interior view of first window installation. |
First reclaimed 8/1 installed. The sash are reclaimed but the jam and sill is new. |
Warm light, cold night. |